
* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
1167293Foil Tape (1)66057Trim Cap (1)66462Hasp (1)66684Spring Latch (2)66016Facia Cap(1 Right and 1 Left)66463Swivel Staple (1)66714#6-32x7/16" (
Parts List BS1212Assembly Part Part Quantity CheckKey No. Number Description in Carton List 1 8060 Right Gable 1 2 8061 Left Gable 1
13Assembly by Key No.BS13252229252611265191951287202019197727534944123535344191919192766666242483581031313132313030323333161514191735131930301918 2123
1 Position hinges on sides of rightand left door panels as shown andfasten with 7/16" (11 mm) flat headbolts outside and #6 hex nuts inside.2 Sli
●●●●● 9796 Ramp (1)●●●●● 9795 Floor Frame (2)●●●●● 8976 Side Floor Frame (4)● Parts Needed For ●Floor Frame AssemblyStep 2 BS15The floor frame must b
16Step 3BR16● Parts Needed For ●Corner Posts/Rear Siding●●●●● 9793 Corner Post (2)●●●●● 8075 Rear Siding (1)STEP1 Fasten two corner posts to therear c
17Step 4BS17● Parts Needed For ●Corner Posts/Studs/Siding●●●●● 6481 Gusset (4)●●●●● 9793 Corner Post (2)●●●●● 8433 Siding Stud (1)●●●●● 8434 Siding St
18Step 5BS18● Parts Needed For ●Headers/Frames/Jambs●●●●● 9791 Front Header (1)●●●●● 8437 Side Eave Frame (2)●●●●● 8062 Rear Header (1)●●●●● 9789 Left
19Step 6BS19● Parts Needed For ●Side/Rear Siding/Studs●●●●● 8431 Side Siding (4)●●●●● 8075 Rear Siding (1)●●●●● 8067 Siding Stud (5)●●●●● 8068 Siding
2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
20Step 7BS20● Parts Needed For ●Gables/Peak/Roof Frames●●●●● 8061 Left Gable (1)●●●●● 8060 Right Gable (1)●●●●● 8438 Side Peak Frame (2)●●●●● 8066 Roo
21Step 8BS21● Parts Needed For ●Side Siding/Foam Tape●●●●● 8431 Side Siding (4)STEPInstalling the siding to the roof isbest done with a step ladder.1
1 Fasten remaining top siding(5 board), to the top side of building.2 Fasten peak trim to peak of roofusing screws thru siding into frame.3 Apply fo
1 Position doors in corners of dooropening as shown and fasten hingeswith 7/16" (11 mm) flat head bolts and#6 hex nuts. Be sure the heads onhing
AnchoringAnchor your building at this time.Floor FrameIf you have purchased a Floor Frame Kit you need to install it at this time.24Anchoring and Floo
SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin
3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go
4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
ACCESSORIES... A6 WEB6* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20,3-30,5 c
THIS PAGEWA SLEFTBLANKINTENTIONALLY
THIS PAGEWA SLEFTBLANKINTENTIONALLY
The Base For Your Building9FRONT(DOOR)FRONT(DOOR)Base BS09Note: Finished Slab dimensions, with lumber removed.116 3/4"296,5 cm50 1/2"128
Komentarze do niniejszej Instrukcji